As the construction of the New Magbele Bridge initially known as Gbere Bridge, have been completed, the President, Dr Julius Maada Bio will tomorrow commission and open to pedestrians The New Bridge.

The new Bridge is absolutely breathtaking, one of it kind in Sierra Leone skilfully built with high quality materials.

According to what the Project Manager of Compagnie Sahélienne d’Entreprises (CSE) had told Awoko newspaper, a unique concrete mixture was utilized in the construction of the bridge not only for longevity purpose but also to give the design an attractive appeal as the bridge’s foundation is anchored within the river’s bedrock, which makes it to have a century lifespan.